+86 990 6852 221

Stock Code

873915

High viscosity carboxymethylcellulose sodium salt HV-CMC

High viscosity carboxymethylcellulose sodium salt HV-CMC

In addition to the basic properties of conventional products, our company's high viscosity carboxymethyl cellulose sodium salt (HV-CMC) and low viscosity carboxymethyl cellulose sodium salt (LV-CMC) are characterized by: adding HV-CMC to saturated saline drilling fluid can not only improve the apparent viscosity of the drilling fluid, but also improve the dynamic-plastic ratio and static shear force of the drilling fluid, so that the drilling fluid has strong sand carrying capacity and strong ability to clean the wellbore; the filtration loss reduction ability of the LV-CMC is still very good when added to saturated saline drilling fluid. Therefore, this agent has a good effect on site, especially in the drilling fluid in the Jianghan Plain area where the salt content is high, it shows good anti-salt viscosity and anti-salt loss of filtration.

Product Performance

project Finger     Target
LV-CMC HV-CMC
Starch or starch derivatives none
Solution viscometer 600r/min read value                                      90 -
Suspension filtration loss, mL                                       10.0
Viscometer 600 r/min read value ≥ Deionized water - 30.0
brine
Saturated brine


Product instructions

This product is suitable for freshwater, brine, composite brine drilling fluid and water-based drilling fluid systems with different relative densities. When in use, the product drying agent can be added slowly in the feed port or the slurry circulation tank, and it is best to first make the agent into 0.8% glue solution. The feeding speed should not be too fast, keep the speed at 0.5 tons to 1.0 tons per hour to prevent the concentration from being too concentrated and cause obvious viscosity increase in the drilling fluid. This agent has a good effect when the concentration of freshwater drilling fluid is 0.3% to 0.4%; this agent has a good effect when the concentration of brine or composite brine drilling fluid is 0.5% to 0.7%; therefore, to maintain the effective concentration of the agent in the drilling fluid, the drilling fluid must be added every 1 to 2 days to cycle, and the amount is 0.1% to 0.2%, that is, 0.1 to 0.2 tons are added to every 100 cubic meters of drilling fluid.